Gas Transit To Armenia Resumed
21 February, 2012
Natural gas transit to Armenia has been resumed in a test mode. Trunk pipeline operator - Georgian Gas Transportation Company (GGTC) has completed repair works, however due to adverse weather conditions the pipeline was launched in a test mode.
Gas Transportation to Armenia was suspended on February 20, as a result of a gas leak at 65 km of the North-South Main Gas Pipeline
Gas Transportation to Armenia was suspended on February 20, as a result of a gas leak at 65 km of the North-South Main Gas Pipeline